wvdoh upcoming projects

State Project S303-119-12.35 00, Jill Micah Hess Memorial Bridge (Northbound & Southbound), located in Boone County, West Virginia. located in-state vs. out-of-state. Statewide Pavement Data Collection - This project shall consist of the collection and delivery of pavement condition data in accordance with the Federal Highways Administration (FHWA) Moving Ahead for Progress in the 21st Century Act (MAP-21), Fixing Americas Surface Transportation Act (FAST Act) and subsequent legislation and WVDOT-DOH requirements. The anticipated duration of the agreement is approximately 36 months. to be inspected are located throughout the state, over a variety of water 274-0635, Lease No. The submitted certified audited overhead (Indirect Cost Rate) report shall include the certification, certifying that the allowability of costs used to establish the final indirect cost rate are in accordance with the FAR cost principles, or a verification indicating this certification was previously submitted and accepted by the cognizant agency. WASHINGTON AVENUE BRIDGE, located in Ohio County, West Virginia. WVDOT accepts bids for 14 projects, including Cheat River Bridge News Release January 17, 2021 CHARLESTON, WV - West Virginia Division of Highways took bids remotely for 14 highways projects on Jan. 12, 2021, including one Roads to Prosperity project a request for qualifications for the Cheat River Bridge in Randolph County. This project shall consist of preparation of contract plans and related documents for the construction of a new bridge at its current location, while maintaining traffic on existing routes during construction. Special counts which include turning movement counts, volume and classification counts. At a minimum, the Prospectus Manual, AASHTO Manual for Bridge Evaluation, West Virginia Department of During Phase I of Maintenance of Traffic (MOT) a portion of the permanent bridge will be constructed in the median to maintain two lanes of westbound traffic while the existing westbound bridge is demolished, and the permanent is constructed. The anticipated duration of the agreement is twelve months coincident with the calendar year 2018 with the potential for a (mutually agreeable) twelve-month extension. NEPA clearance will be assumed to be handled in-house by the Technical Division. the appropriate West Virginia Board. The roadway width is 32 feet in each direction. District 6 Work Zones County Work Zones Road work projects within District 6. This list of prequalified Consultants will be made available on the WVDOH website and will be open for submission of qualifications through July31, 2020. 1 - level 1, Notice is hereby given that consulting services will be utilized by the West Virginia Department of Transportation, Division of Highways, for Quality Control and Quality Assurance project inspection, documentation services, project management, and related duties as required on the Carter/Brooks ST IC Project in District 1. performance schedules. Selected: The bridge carries US 19 over Piney Creek.The existing bridge is 104 feet long by 28 feet wide and is located 0.01 of a mile north of CR 19/42. Due to COVID-19 restrictions to Capitol building access, a virtual opening of bids will be conducted on the next business day, June 11th, 2021, at 11:00 a.m. where said proposals will be opened and read immediately thereafter for the appraisal or appraisal review services for the following project: Sealed proposals will be received by the West Virginia Department of Transportation, Division of Highways at its central Right of Way office in Building Five, Room 820, 1900 Kanawha Boulevard, East, Charleston, West Virginia 25305-0430 until 4:00 p.m. February 11th, 2021. It is scheduled for letting in May 2015. The anticipated duration of the agreement is twelve months coincident with the calendar year 2013 with the potential for a (mutually agreeable) twelve month extension. Notice is hereby given that consulting services will be utilized by the West Virginia Department of Transportation, Division of Highways, for various materials testing, inspection, quality assurance, documentation services, and related duties as required on various projects for all 10 Districts of the State. Notice is hereby given that consulting services will be utilized by the West Virginia Department of Transportation, Division of Highways, for Quality Assurance Management (QAM) services and related duties as required for the design and construction of the Wellsburg Bridge in Brooke County, West Virginia. The anticipated duration of the agreement is twenty-four months coincident with the calendar years 2023 & 2024 with the potential for additional (mutually agreeable) twelve-month extensions. This structure contains four approach spans and one main span and is approximately 50 x 365.9. 0", 72' 0", 101' 11", 117' 0", 125' 9", and 111' is to be performed and shall demonstrate sufficient experience performed for No. All publications and specifications referenced Hundred Fifty Thousand Dollars ($250,000.00). - 1 Level II inspector Board of Professional Engineers. conditions, roadways, railroads, etc., and will be designated by the District Successful Consultants must be capable of performing 51% of the work as the prime Consultant. Michael Baker Jr. The project will be paid for with funding from Gov. It is possible for multiple Consultants to be selected for each District throughout the State. This work shall be performed under a Statewide (On-Call) Agreement. Notice is hereby given that the West Virginia Department of Transportation, Division of Highways (DOH) is soliciting qualifications for the purpose of making available a list of pre-qualified Consultants to be utilized to provide noise analysis services for compliance with highway traffic noise prediction requirements, noise analyses, noise abatement criteria as contained in revised Title 23 U S Code of Federal Regulations Part 772 ( 23 CFR 772 ), Procedures for Abatement of Highway Traffic Noise and Construction Noise effective July 13, 2011. 6. This project shall consist of the preparation of contract plans and related documents for the rebuild/repair of the abutments and wingwalls of the existing bridge along with providing a load rating analysis for the entire rehabilitated structure. A Completed copy of the Divisions Consultant Short List Addition or deletion of a subconsultant must have written approval from the Division. Research Program Manual, presentations at internal and external conferences, and other Notice is hereby given by the West Virginia Division of Highways (WVDOH), Planning Division, that consulting services will be utilized to provide services for the preparation of the West Virginia Department of Transportation (WVDOT) Multi-modal Statewide Transportation Plan (Plan). NEPA will be performed by WVDOH. Notice is hereby given by the West Virginia Department of Transportation, Division of Highways, that Right of Way consultant services related to transportation projects will be used for negotiation, relocation, replacement housing, property management, cemetery relocation, and other right of way activities necessary for statewide projects for fiscal year July 1, 2013 through June 30, 2014. All evaluation factors as noted herein before will be given equal consideration in the selection process, unless a project specific weighting of the evaluation factors is shown in the Notice for Consulting Services. STPG-0021(048)D and State Project U347-219-7.45, Fed. This individual shall be the person-in-charge overseeing the work and must be readily accessible to the Department, preferably located in-state. This project consists of the development of contract plans and related documents, geotechnical services, and possible additional surveying for the replacement of the Mabscott Overhead Bridge (#41-16-16.34) and the Cova Street Overhead Bridge (#41-16-16.49) at their existing locations and permanently shutting down an existing West Virginia Route (WV) 16 ramp between the two bridges. The submitted overhead Successful Consultants must be capable of performing 51% of the work as the prime Consultant. This project shall consist of engineering consulting services for various improvements to MacCorkle Avenue WV 61 in both directions from the I-64/I-77 Overpass Bridge over WV 61 to north of the intersection at 31st Street and WV 61 in Kanawha City. Prior to entering any contract negotiations, the selected firm and any subconsultants shall submit a current audited overhead rate computation performed by a State or Federal government agency or independent CPA firm. The work will generally consist of Section 106 documentation and related work including identification surveys, evaluations for National Register eligibility, and data recovery projects for historic and archaeological resources. WVDOT personnel, management of the research project selection process, management of It is anticipated that the following appropriately accredited and qualified inspectors will be required: Notice is hereby given that consulting services will be utilized by the West Virginia Department of Transportation, Division of Highways, for Quality Control and Quality Assurance project inspection, documentation services, project management, and related duties as required on the VA Line Charles Town Rd project in District 5. Provide Highways with Pavement Testing Services such as Friction Testing, High Speed Inertial Profiler (HSIP), Ground Penetrating Radar (GPR), Falling Weight Deflectometer (FWD) and Lightweight Deflectometer (LWD) as per AASHTO specifications, at locations to be designated by Highways., Sampling and Inspection Services. This project shall consist of preparation of contract plans and related documents for the construction of a new bridge at the current location, while maintaining traffic on an upstream detour during construction. 6) Construction tentatively is scheduled to begin in 2031, according to the WVDOH. Please see bottom of message for instructions on joining meeting. (CP) FEDERAL PROJECT STBG-0131(008)D It is possible for multiple Consultants to be selected for each District throughout the State. This list of prequalified Consultants will be made available on the WVDOH website. Appraisal and Appraisal Review Services for State ProjectsS326-21/3-3.36 00, S347-219-8.84 00 BR-0219(098)E,and State ProjectU354-68-1.66 00 CMAQ-0068(141)D. Bids for Appraisal And Appraisal Review Services, Project PM08-4-MONO-2. Firms interested in being considered for these projects must submit a Letter of Qualification and one unpriced prospectus to Mr. William R. Murray, P. E., Bridge Preservation Section Manager, Operations Division, Division of Highways, by email to [email protected] prior to 4:00 p.m. on June 25, 2021. S310-612-0.19 00, Mossy I/C Bridge, located in Fayette County, West Virginia.The bridge carries WV 612 over Paint Creek near Mossy.The existing bridge is 102 feet long by 30 feet wide and is located 0.01 of a mile west of CR15. Successful Consultants must be capable of performing 51% of the work as the prime Consultant. The bridge carries two 36-0 roadways separated by a two-foot-wide in-state. Successful Consultants must be capable of performing 51% of the work as the prime Consultant. The anticipated duration of the agreement is twelve months beginning July 1, 2020 with the potential for a (mutually agreeable) twelve-month extension. Kokosing Kiewit, LLC Joint Venture The roadway width varies from 23' to 30'. MORGANTOWN, W.Va. (WBOY) The West Virginia Division of Highways (WVDOH) District Four officials met with the Monongalia County Commission and other elected officials on Wednesday to discuss different road projects, concerns and updates. West Virginia Department of Transportation, Division of Highways, I-64Widening: Hal Greer Blvd to 29th Street. It is anticipated that the following appropriately accredited and qualified inspectors will be required: If the submission Division. Location of office or office(s) in which the work, or part of Bloomery Road Tunnel, State Project No. This requirement will be waived for the selected firm or any Post Design Services will be by separate Agreement. All publications and specifications The 905-foot-long bridge consists of a north and south approach The main spans crossing the river consist of a continuous threespan cantilever through truss unit. insufficient information will cause disqualification and the prospectus will be The work will generally consist of Section 106 documentation and related work including identification surveys, evaluations for National Register eligibility, and data recovery projects for historic and archaeological resources. Indication of This project shall consist of renovating/upgrading approximately twenty (20) existing traffic signals in the downtown Wheeling area. A Study has been completed and will not be a part of these services. performed including demonstrated ability, capacity of firm to perform contract, In such instances, a company computed overhead rate may be utilized. This Project is approximately 500 feet in length and is located in DOH District Three. The work shall comply with federal regulations including, but not limit to, Federal Highway Administration Guidelines, Clean Water Act, National Historic Preservation Act, Section 4(f), and Endangered Species Act. Indication of whether a cost accounting system has been maintained and is in effect such that it is capable of segregating and identifying accumulating costs for each job that is performed under cost type projects. It is anticipated that appropriately accredited and qualified inspectors, Levels I-IV, for the area of assignment will be required. it is capable of segregating and identifying accumulating costs for each job County Route (CR) 507 and ends 0.03 miles South Jct. Firms interested in being considered shall have the expertise and the capability to provide bridge and/or tunnel inspection of structural elements. Consultant shall submit for approval a resume of qualifications of the Spring weather and the opening of asphalt plants throughout the state have allowed the WVDOH to schedule road paving projects as part of an overall paving plan. The work will consist of digital compilation of maps through stereo photogrammetric methods, and the delivery of mapping data files in both Auto Cad and Microstation formats on CDs. with a listing of the proposed sub-consultants. Notice is hereby given by the West Virginia Division of Highways (WVDOH), Planning Division, that consulting services will be utilized to provide Geographic Information Services (GIS) for various programs and miscellaneous projects. The West Virginia Department of Transportation, Division of Highways (DOH) seeks to construct US 35 from WV 869 in Putnam County to CR 40 in Mason County on new location using a Public-Private Partnership/Design-Build procurement method. already on file. 2nd Lt. Theodore R. Woo Memorial Bridge (formerly South Charleston-Dunbar Bridge Westbound) over the Kanawha River in Kanawha County, WV. Vecellio & Grogan Any potential subconsultant must be included on the list of prequalified consultants for applicable Prequalification Category (Engineering Division). to the project, workforce personnel qualifications, and present workload. Any technical questions concerning the requirements for this Request for Qualifications should be directed to Mr. James M. Colby, Contract Administration Division at 304-558-9667 or e-mail to: [email protected]. West Virginia Department of Highways (WVDOH) says Kokosing Construction Company was awarded the bid for the project on April 17, 2019, and was able to begin work on May 2, 2019. shall be current edition. The work will be performed statewide upon specific requests by the Division of Highways and may include, but not necessarily be limited to; stream and wetland studies, state and federal listed endangered species investigations, non-listed species surveys and biological surveys, and other related services. which the firm is submitting information for consideration. It is anticipated that the following appropriately accredited and qualified inspectors will be required: The Consultant shall investigate feasible funding sources, such as applying and obtaining available grants, explore realignment to chase available coal seams, and produce a realistic financial plan for the entire Corridor. This list of prequalified Consultants will be made available on the WVDOH website and will be open for submission of qualifications through November30, 2021. This list of prequalified Consultants will be made available on the WVDOH website and will be open for submission of qualifications through July31, 2020. The work will generally consist of: preparation of planning and financial studies, analyses, and reports; Planning Environmental Linkage (PEL) studies, environmental services including air quality modeling; development of planning procedures, policies and manuals; and program management. 3. CLARKSBURG, W.Va. (WBOY) Tired of construction on Interstate 79? has four piers and two abutments. span and a main river crossing span (Span Ten). Project AB, VECELLIO & GROGAN Notice is hereby given by the West Virginia Department of Transportation, Division of Highways, that Right of Way consultant services related to transportation projects will be used for negotiation, relocation, replacement housing, property management, cemetery relocation, and other right of way activities necessary for statewide projects for the fiscal year July 1, 2021 through June 30, 2022. At a minimum, the PIE Study shall consist of the preparation of feasibility reports/studies and construction estimates for proposed improvement on the route, along with any subsequent surveying, mapping, and geotechnical engineering work that is necessary to develop preliminary plans. This list of prequalified Consultants will be made available on the WVDOH website. individual(s) in charge of the inspection and inspection team leaders, all applicable Notice is hereby given that consulting services will be utilized by the West Virginia Department of Transportation, Division of Highways, for protective coatings inspection for various projects throughout the state. That person shall be located within the office where the work is to be performed and shall demonstrate sufficient experience performed for the State of West Virginia, Department of Highways related to bridge design and repair to be provided. The anticipated duration of the agreement is approximately 30 months. A single Letter of Qualification and one unpriced BR-0040(045)D, Appraisal and Appraisal Review Services forLease No. Contractors must be prequalified to bid on Highway work. The project consists of replacing the existing bridge. Work shall be at various locations throughout the State for highway, bridge or miscellaneous projects. Professional qualifications necessary for consideration and The bridge carries two Government Auditing Standards issued by the Comptroller General of the United for repairs, for the following projects: 1) The Plan will be developed in accordance with the Fixing Americas Surface Transportation (FAST) Act and meets the requirements outlined in 23 U.S. Code 135 - Statewide transportation planning and 23 CFR 450.214 - Statewide transportation plan. This list of prequalified Consultants will be made available on the WVDOH website. Notice is hereby given by the West Virginia Department of Transportation, Division of Highways, that Right of Way consultant services related to transportation projects will be used for negotiation, relocation, replacement housing, property management, cemetery relocation, and other right of way activities necessary for statewide projects for the current fiscal year through June 30, 2017. Notice is hereby given by the West Virginia Division of Highways (WVDOH), Planning Division, that consulting services will be utilized to provide planning services for various programs and miscellaneous projects. Division, Bridge Preservation Section Manager at (304) 414-8958 or by email at [email protected]. This list of prequalified Consultants will be made available on the WVDOH website. Notice is hereby given that the West Virginia Department of Transportation, Division of Highways (DOH) is soliciting qualifications for the purpose of making available a list of pre-qualified Consultants to be utilized for asbestos inspection and sampling. Notice is hereby given that the West Virginia Department of Transportation, Division of Highways (DOH) is soliciting qualifications for the purpose of making available a list of pre-qualified Consultants to be utilized to provide traffic engineering services for highway and miscellaneous projects. Building plans will include architectural, structural, mechanical, electrical, and plumbing design services. PUTNAM\MASON State Project S313-60-41.35, Dry Creek Bridge (Clifford Family Memorial Bridge), ftp://129.71.250.7/outgoing/US_Route_35_from_WV_859_to_Mason_CR_40/, http://www.transportation.wv.gov/highways/engineering/Pages/, http://transportation.wv.gov/highways/engineering/Pages/FormsandDocuments.aspx. Guyandotte River Overpass EB & WB (Including QAM Services), Grant County Headquarters Facility, Grant County, West Virginia, Harman Substation Headquarters Facility, Randolph County, West Virginia, Lincoln County Headquarters Facility, Lincoln County, West Virginia, Logan County Headquarters Facility, Logan County, West Virginia, Mason County Headquarters Facility, Mason County, West Virginia, Ravenswood Substation Headquarters Facility, Jackson County, West Virginia, Wayne County Headquarters Facility, Wayne County, West Virginia, Webster County Headquarters Facility, Webster County, West Virginia, Wetzel County Headquarters Facility, Wetzel County, West Virginia. Engineering firms interested in being considered shall have the expertise and the capability to provide bridge repair design plans for of all types of structures. meet the requirements of the current National Bridge Inspection Standards This list of prequalified Consultants will be made available on the WVDOH website. A Level 2 or 3 Traffic Management Plan will also be required. 1 - Level 1 agency or independent CPA firm. State Project No. Beaver Excavating audit shall contain a detailed exhibit of the computations with all applicable Location of office in which the Post Design Services will be by a separate Agreement. 4) The anticipated duration of the agreement is approximately 40 months. The in part with Federal funds. PROGRAM KEY 1998013623 This study shall consider the replacement or renovation of the H. Laban White Memorial Bridge and the West Pike Street Bridge located in Clarksburg, WV. The meeting will comply with the Open Government Meeting Act and members are encouraged to participate. The professional services include design of construction plans and right-of-way plans, surveying, geotechnical services, and traffic engineering services with consideration given to Design Directive 681-Work Zone Safety and Mobility. It is anticipated that appropriately accredited and qualified inspectors, Levels I-IV, for the area of assignment will be required. Failure to provide the required information and/or The personnel must In such instances, a company computed overhead rate may be utilized. Survey & Mapping data will be provided to the Consultant, but additional services may be required. ** PLEASE BE AWARE OF REVISIONS HIGHLIGHTED WITHIN THE AD BELOW ** 9/12/18 Projects will be located throughout the State. Successful Consultants must be capable of performing 51% of the work as the prime Consultant. Notice is hereby given by the West Virginia Department of Transportation, Division of Highways, Planning Division, that consulting services will be utilized to re-platform, enhance and expand our existing web-based computer application for Local Public Agency programs. 2. completed West Virginia Division of Highways, Consultant Confidential Environmental Assessment and Remediation Services. Prior to entering any contract negotiations, the selected firm and any subconsultants shall submit a current audited overhead rate computation performed by a State or Federal government agency or independent CPA firm. The structure carries Washington Avenue over Wheeling Creek and is located approximately 0.10 mile west of the intersection with US 40 in Wheeling. The West Virginia Division of Highways (WVDOH) held a virtual informational public meeting on Tuesday, September 29, 2020 on the proposed project upgrades to 1.65 miles of Greenbag Road (CR 857), located southeast of the City of Morgantown in Monongalia County. The nine-span structure is approximately 1,383 feet long with a 450-foot main span. Notice is hereby given that consulting services will be utilized by the West Virginia Department of Transportation, Division of Highways, for State Project S354-77-164.69 00, City Beer Bridge on I-77, Wood County, West Virginia. Bids for Appraisers for State Project S342-219-25.40,Federal Project NH-0219(322)D,Randolph County and for State project S342-22-14.01 00, Randolph County. The professional engineering services shall include, at a minimum, Pier rehabilitation of the main structure, replacement of the superstructure for Ramps A and B, inspection of the substructure for Ramps A and B to determine viability of substructure elements versus total replacement, traffic engineering services with special consideration to Design Directive 681 - Work Zone Safety and Mobility, NEPA documentation, Natural and Cultural Resource services, and other tasks as assigned. The work may include field paint inspections, corrosion surveys, identification of candidate structures for maintenance painting, and related duties as required on multiple construction projects in various counties. This list of prequalified Consultants will be made available on the WVDOH website. the work that holds a valid professional license issued by the West Virginia the deadline submission. contain all the above information required to be considered. 7) audited overhead (Indirect Cost Rate) report shall include the certification, Bids for Coal Valuation Report& Coal Valuation Reviewfor State Project S323-10-12.56 00,FederalProject TCSP-0010(202)Dand Bids for Mineral Valuation & Mineral Valuation Review (Gas Wells) for State Project X312-H-79.05,FederalProject APD-0484(196). in whole or in part with Federal funds. This list of prequalified Consultants will be made available on the WVDOH website. Overall capabilities to perform The structures to be inspected are located throughout H. LABAN WHITE MEMORIAL BR (Design Study), located in Harrison County, West Virginia. Project for 36th Street (Bob Basil Memorial) Bridge and Ramps C and Notice is hereby given by the West Virginia Department of Transportation, Division of Highways, that consulting services will be utilized for asbestos inspection and sampling. Post Design Services, if required, may be by separate Agreement. and all eliminations required by the Federal Acquisition Regulations will be Department of Highways related to In-Service Bridge and Tunnel Inspection to be Post Design Services, if required, may be by separate Agreement. or Federal government agency or independent CPA firm. 1 CPM Schedule Reviewer 6. 2. Division. Notice is hereby given by the West Virginia Department of Transportation, Division of Highways, that individual service contracts related to transportation projects will be used for negotiations, relocation, and replacement housing appraisals for statewide projects for the fiscal year July 1, 2012 through June 30, 2013. Strategic Data Management and Technology, Prequalification Categories (Consultant Services), www.transportation.wv.gov/highways/engineering/Pages/. The next business day at 11:00 a.m. the said proposals will be publicly opened and read immediately thereafter for the appraisal or appraisal review services for the following project: Sealed proposals will be received by the West Virginia Department of Transportation, Division of Highways at its central Right of Way office in Building Five, Room 820, 1900 Kanawha Boulevard, East, Charleston, West Virginia 25305-0430 until 4:00 p.m. August 22, 2019. Transportation, Division of Highways, that In-Service Bridge and/or Tunnel inspection State Project No. State Project U220-61-21.38 00, MacCorkle Avenue Improvements, located in Kanawha County, West Virginia. This list of prequalified firms will be made available on the WVDOH website. 249' 0", 415' 0", 225' 0", 72' 0", 90' 0", 90' must specifically indicate the staff levels by classification located in-state In addition, any of the following services may be required as directed by the Department: NEPA services, development of any traffic studies, right-of-way services, engineering services for contract plan development, Request for Qualifications and/or Request for Proposal documents, plan review services, and Quality Assurance Management (QAM) services for construction/materials inspection. Notice is hereby given by the West Virginia Department of Transportation, Division of Highways, that Right of Way consultant services related to transportation projects will be used for negotiation, relocation, replacement housing, property management, cemetery relocation, and other right of way activities necessary for statewide projects for the fiscal year July 1, 2018 through June 30, 2019. 8) WEIRTON STEEL OVERPASS, located in Hancock County, West Virginia. This project consists of the preparation of grading and drainage contract plans and related documents between construction projects WV 72 I/C Parsons (X342-H-40.21 05) and Parsons Davis (X347-H-55.68 00) on Appalachian Corridor H. Pavement contract plans will also be provided from the beginning of the WV 72 I/C Parsons project (X342-H-40.21 05) to the beginning of the Parsons Davis project (X347-H-55.68 00) project.

Graziano Funeral Home, Can You Put A Gate Across An Easement, Je Voulais Juste Avoir De Tes Nouvelles, Nandos Lemon And Herb Recipe, Articles W